徐州市鑫岳工贸有限公司---热镀锌
 

   




ID:
PASS:
 
special alloy for hot galvanizing
XY-XG-3 type purifying agent for molten zinc
XG-T-Ⅱ“industrial ceramic” zinc pot
galvanizing production line for expressway guard bar and pole

special high pressure hot air generator for inside blow of hot dip galvanized pipe

XY-D-Z-1special vibrator for hot galvanizing
XY-Ⅲ type special solvent treatment device with multiple functions

multi-function corrosion inhibition and fog depression agent during pickling

protection coating for internal wall of zinc pot

“ZD-Ⅱ” type special galvanizing inhibitor for hot galvanizing

“DB-Ⅲ” type protective coatingof sling for galvanizing operation

Inside heater and ceramic galvanizing pot for hot galvanizing
Xinyue Brand XY-D-Z-1special vibrator for hot galvanizing
     During real hot galvanizing production, surplus molten zinc and zinc accretionson the workpiece from molten zinc are unavoi-dable because of different shapes. Influencing the appearance qu-ality of the galvanized workpiece as well as increasing the zinc consumpt-ion notably, they raise the after-galvanizing treat-ment work amou-nt. In order to solve this difficult problem, our company organized technical personnel to comperate with some galvanizing factories and has developed “special vibrator for hot galvanizing”. Long-term operation and experiment indicate that the vibrator has stable work property, excellent accretion-elim-inating results and low repair rate. It is warmly welcomed and well received by hot galvanizing factories.
Using method:
      1. Hang the lifting ring of the vibrator on the hook of traveling crane; hang slings on the hook of the vibrator;

      2. Insert the fixed end of the steel-wire rope of the crane hook into the helix cable of the vibrator from thetop to the bottom, fix the end and the top end of the cable on a proper location of the motor hoist, connect electric source with the cable using rubber cable and control switch is set on its outside. Weld a support plate on the shell of the pulley to move the helix cable.( see photo)

      3. Adjust the top lifting limit of the hook to proper location.
      4. After the workpiece is completely immersed into molten zinc, switch on the vibrator and make it oscillate. Owing to high oscillating frequency and proper amplitude, vibrating force can be transferred to the workpiece through steel-wire rope, keep it high frequency vibration in molten zinc, and so “ash and slag” are floated rapidly, galvanizing time is decreased and coating becomes thinner. After “ash and slag” is completely floated, switch off vibrator and use skimming knife to eliminate floated “ash and slag”. Finally the crane lifts the workpiece from molten zinc at 1.2~1.5 m / min speed.
      5. After the whole workpiece leaves molten zinc surface, switch on the vibrator and so the surplus zinc accretions on it fall into the zinc pot.
Performance index:
Appearance size: 500mm×300mm×280mm
Vibrating force: 1000kg/f
Power: 2.2KW
Vibrating frequency: 2800 / Min
Working mode: continuous
Voltage: AC380V
 
China Nonferrous Metals Industry Technical and Economic Research Institute
Xuzhou Xinyue Industry and Trade Co., Ltd 苏ICP备06040650号